Feasibility Study for the Peachtree Creek Greenway Connector Trail

Project SummaryThe PATH Foundation, Inc. (PATH) will provide the following services to the City of Doraville to verify the feasibility of the Peachtree Creek Greenway (PCG) connector trail from the North Fork Peachtree Creek to Doraville City Hall and the Doraville MARTA Station:

  • Trail study development, such as field work and data collection to result in a draft plan;
  • Creation of and facilitating input from a steering committee;
  • A public meeting;
  • A final trail study with implementation strategy; and
  • A presentation and plan for adoption by Council.
This feasibility study kicked off September 2021 and will likely take about 6 months.

Public MeetingA public meeting was held at the Chestnut Drive Church of Christ at 3545 Chestnut Drive on Tuesday, November 9, 2021. The meeting included a presentation as well as feedback and input from those who attended. Meeting details and materials are linked below: